Accelerating The Readiness of The H2 Plant Unit and Maintaining the Quantity of HCU Valuable Product During Repairs to The Radiant Tube Reformer Leak Using a New Radiant Tube Reformer Plugging Method at PT Pertamina Patra Niaga Refinery Unit II Dumai

Authors

  • Indra Harapan Situmorang PT Pertamina Patra Niaga Refinery Unit II Dumai, Indonesia
  • Akbar Putra Jhonem PT Pertamina Patra Niaga Refinery Unit II Dumai, Indonesia
  • Rudi Hermawan PT Pertamina Patra Niaga Refinery Unit II Dumai, Indonesia
  • Edward Cantona Taufan PT Pertamina Patra Niaga Refinery Unit II Dumai, Indonesia
  • Zulfajri Zulfajri PT Pertamina Patra Niaga Refinery Unit II Dumai, Indonesia

DOI:

https://doi.org/10.59888/ajosh.v4i7.696

Keywords:

hydrogen plant, radiant tube reformer, emergency repair, plugging method, downtime reduction

Abstract

This paper presents an operational reliability case study from the hydrogen plant that supports the hydrocracking complex at PT Kilang Pertamina Internasional Unit II Dumai. A crack was identified in radiant tube Row A No. 10 in reformer 702-H-1, creating an urgent risk of hydrogen release, tube rupture, fire escalation, and prolonged production loss. The conventional corrective action, namely full retubing with a new tube and ceramic-on-ceramic (COC) restoration, required approximately 138 hours and depended on spare tube availability. To reduce downtime and avoid a multiplier effect on the hydrocracker value chain, the team developed a new plugging method that isolated the failed radiant tube by installing welded plugs at both the outlet and inlet sides instead of replacing the entire tube. An engineering design package was prepared using 3D modeling, stress analysis, material selection for SS 310 and HK40 components, and load verification at the design pressure of 20.5 kg/cm². The implemented method restored operation faster than the historical retubing route, achieving a repair duration of approximately 40 hours versus 138 hours for the previous method. Operational impacts reported by the plant included normal H? plant operation above 30k Nm³/h, preserved jet fuel quality, medium-risk work exposure instead of high-risk exposure, avoided costs of approximately IDR 244.8 million, and protection of HCU profit equivalent to around IDR 10 billion. The case demonstrates that a fit-for-purpose plugging strategy can be an effective emergency repair option for radiant tube failures when supported by engineering verification, fabrication control, and formal standardization

References

PT Pertamina Patra Niaga Refinery Unit II Dumai. PCP Nusantara 2.0 presentation materials.

PT Pertamina Patra Niaga Refinery Unit II Dumai. PCP Nusantara 2.0 movie storyboard

Ray, A.K., Sinha, S.K., Tiwari, Y.N., Swaminathan, J., Das, G., Chaudhuri, S., and Singh, R. (2003). Analysis of failed reformer tubes. Engineering Failure Analysis, 10(3), 351–362.

Bonaccorsi, L., Guglielmino, E., Pino, R., Servetto, C., and Sili, A. (2014). Damage analysis in Fe–Cr–Ni centrifugally cast alloy tubes for reforming furnaces. Engineering Failure Analysis, 36, 65–74. https://doi.org/10.1016/j.engfailanal.2013.09.020

Bahrami, A. and Taheri, P. (2019). Creep failure of reformer tubes in a petrochemical plant. Metals, 9(10), 1026. https://doi.org/10.3390/met9101026

Dobrotvorskaia, A.N., Dobrotvorskii, M.A., Shevyakova, E.P., and Simanov, M.A. (2022). Failure cause assessment of steam reformer radiant tube after long-term service. Materials and Corrosion. https://doi.org/10.1002/maco.202213068

Fuyang, C., Zhou, Y., Shao, B., Zhang, T., Guo, X., Gong, J., and Wang, X. (2021). Weldability and damage evaluations of fresh-to-aged reformer furnace tubes. Metals, 11(6), 900. https://doi.org/10.3390/met11060900

Fuyang, C., Zhu, L., Gong, J., and Wang, X. (2020). Feasibility assessment of local repairment for reformer furnace tubes in service exposure. International Journal of Pressure Vessels and Piping, 181, 104032. https://doi.org/10.1016/j.ijpvp.2019.104032

American Petroleum Institute (API). API Standard 560: Fired Heaters for General Refinery Service. 5th ed. Washington, DC: API; 2016.

American Petroleum Institute (API). API Standard 530: Calculation of Heater-Tube Thickness in Petroleum Refineries. 7th ed. Washington, DC: API; 2015.

American Petroleum Institute (API). API Recommended Practice 573: Inspection of Fired Boilers and Heaters. 5th ed. Washington, DC: API; 2023.

API/ASME Joint Committee. API 579-1/ASME FFS-1: Fitness-For-Service. Washington, DC / New York, NY: API and ASME.

American Society of Mechanical Engineers (ASME). Boiler and Pressure Vessel Code, Section II, Part D: Properties. New York, NY: ASME.

American Society of Mechanical Engineers (ASME). Boiler and Pressure Vessel Code, Section IX: Welding, Brazing, and Fusing Qualifications. New York, NY: ASME.

Larson, F.R. and Miller, J. (1952). A time-temperature relationship for rupture and creep stresses. Transactions of the ASME, 74, 765–771.

Downloads

Published

2026-04-08